PHOTO ALBUM
ACCURACY: Less than 30" between tunnels
Below: Welding steel entrance rings for the launching of the head into each tunnel. Palmetto Expressway, Miami Florida
ACCURACY! No room for error on this project - the tunnel had to go through this opening in the water treatment plant and it was right on the money! (Pembroke Pump Station)

Below: Pembroke Pump Station - Tunnel Machine entering the receiving shaft. Water is not a problem!

MINIMAL GROUND DISRUPTION: VDOT - Alexandria Virginia: Huxted Tunneling installed a 75.5 inch O.D. tunnel 184 feet long under the Beltway for Shirley Contracting, LLC. The tunnel was installed successfully with less than five feet of cover over the top of the pipe. Ground radar confirmed there was no loss of ground or voids caused by the tunnel, and grouting was not necessary.


Above: VDOT Virginia project - tunnel machine entering the receiving shaft.
Below: Work doesn't always stop when the sun goes down....
Below: Earplugs are a must when working at the Miami International Airport